Engineering sprint
From a stuck idea to an action plan and a first prototype
A concentrated period in which an engineer gets deep into the project, breaks it down, and gets you out with a direction and a first deliverable.
What you get
An action plan
Including a first physical deliverable where relevant
- DFM / DfAM
- Risk map
- NDA signed on request
When the project will not move and nobody knows why
The sprint suits exactly these moments:
- Development stalled before the prototype and nobody knows what the real blocker is.
- There are plenty of ideas and no decision on which to test first.
- You need to show progress to an investor or to management inside a fixed window.
- The team is stretched and has no time to stop and think the product through.
Exactly what you get
-
A deep engineering review
We break the product down and identify what is genuinely holding it up.
-
DFM / DfAM
The design is matched to the production method at this stage, not afterwards.
-
A risk map
What is risky, what is expensive and what can safely wait for a later stage.
-
A first physical deliverable
Where it makes sense, you leave the sprint with a part in hand and not only a document.
How it works
-
1
Set the sprint goal
What has to be resolved by the end, so there is a clear success criterion.
-
2
Concentrated work
An engineer joins the project and works on it intensively alongside your team.
-
3
Wrap up and hand over
An action plan, the findings and recommendations for what comes next, with us or without us.
A good fit if
- The project is stuck before the prototype
- You need a result inside a fixed window
- There is a deadline with an investor or a client
- You want a clear direction, not another meeting
Less of a fit if
-
You only need a direction-setting call
An engineering consultation is shorter and cheaper.
Details →
-
The need is ongoing rather than concentrated
A monthly engineering retainer suits better.
Details →
-
You know what you need and just want the part
A functional prototype is the next step.
Details →
Companies that have already worked with us
From an idea on paper to a product in production.
Frequently asked questions
How long does a sprint run?
It is set by the scope of the project and the goal we defined. You get an exact schedule in the proposal, before anything starts.
Does our team need to be available?
Yes, at least partly. A sprint works best when there is one point of contact on your side who is reachable for questions.
What if the conclusion is that the direction has to change?
That is a legitimate outcome, and sometimes the most expensive one avoided. Better to find out in a sprint than after a year of development.
Are we committed to continuing with you?
No. Everything produced is yours and you can take it wherever you choose.