Production optimisation
The same product at lower cost, with fewer rejects
For a product already in production: we find where unnecessary cost sits, where rejects are created and where lead time is being burned.
What you get
An optimisation plan
Process, method, material, design and supplier
- ISO 9001:2015
- Independent analysis
- Recommendations ranked by return
The product is being made, but the process leaks
The signs that call for optimisation:
- A reject rate that stays high and nobody has pinned down why.
- Lead times that stretch out and hurt customers.
- A unit cost that does not come down even as quantities rise.
- A process that was built once and has only been patched since.
Exactly what you get
-
A map of the current process
Exactly where time, material and money are burned through production.
-
Root-cause analysis of rejects
Whether the problem is the design, the material, the method or the inspection.
-
Ranked recommendations
By size of impact against implementation effort, so you know where to start.
-
Method and supplier alternatives
Where a change of technology or supplier changes the picture materially.
How it works
-
1
Gather the data
Files, quantities, costs, reject rates and lead times.
-
2
Analyse the process
From the design through to final quality control.
-
3
You get an optimisation plan
With what to implement first and the saving expected from each step.
A good fit if
- You have a product in active production
- There is a reject rate that worries you
- Costs are not falling with quantity
- Lead times are stretching
Less of a fit if
-
The problem is one part, not the process
A cost reduction review focuses on the part itself.
Details →
-
You have not started producing yet
A production launch builds the process right from the start.
Details →
-
You need an opinion on the design
An engineering review examines the design in depth.
Details →
Companies that already manufacture with us
Manufacturing plants, medical, defence and industry.
Frequently asked questions
We produce with another supplier - is this relevant?
Yes. The analysis is independent, and in many cases the recommendations are implemented at your existing supplier.
What data do you need from us?
Files, quantities, unit cost, reject rates and lead times. The more data there is, the more precise the recommendations.
Does this mean stopping production?
No. The analysis runs alongside ongoing production.
What if the process is fine and there is nothing to improve?
We will tell you so. That is also an answer, and it is worth having from an independent party.